@article { author = {Tajik, Majid and Oruji, Mohammad and Novin, Arman}, title = {Assessment of TBM performance in tunnel excavation (first lot of Karaj - Tehran water conveyance tunnel)}, journal = {Scientific Quarterly Journal of Iranian Association of Engineering Geology}, volume = {3}, number = {شماره 1 و 2}, pages = {41-50}, year = {2010}, publisher = {Iranian Association of Engineering Geology}, issn = {2228-5245}, eissn = {}, doi = {}, abstract = {Karaj - Tehran water conveyance tunnel (LOT1) was excavated by TBM with 4.66 m diameterwhereas the utilization factor is different with tunnel length. According to geological condition,excavated length and personal skill, TBM performance has been compared in four equal parts oftunnel. Evaluation of TBM Activity and delay time shows that in addition of specified factors, theutilization factor also depends on the overlap of activities. In this project utilization factor for everypart is 18.30, 22.26, 16.09 and 16.08 respectively.}, keywords = {TBM,water conveyance tunnel,utilization factor,Geology}, title_fa = {بررسی عملکرد ماشین حفاری مکانیزه (TBM) در حفاری قطعه اول تونل انتقال آب کرج - تهران}, abstract_fa = {حفاری قطعه اول تونل انتقال آب کرج – تهران توسط TBM با قطر 66/4 متر در حالی انجام شد که ضریب بهره‌وری دستگاه در طول مسیر حفاری کاملا متفاوت بود. براساس شرایط زمین‌شناسی، فاصله ماشین تا دهانه تونل و مهارت فردی پرسنل عملکرد ماشین حفاری در چهار بخش مساوی از تونل، مقایسه و ارزیابی گردید. بررسی فعالیت­ها و تأخیرات ماشین حفاری نشان می‌دهد که نرخ تغییرات ضریب بهره‌وری علاوه بر پارامترهای فوق به میزان هم‌پوشانی فعالیت­ها نیز بستگی دارد. ضریب بهره­وری در بخش اول 30/18، بخش دوم 26/22، بخش سوم 09/16 و در بخش چهارم 08/16 به دست آمد.}, keywords_fa = {TBM,تونل انتقال آب,ضریب بهره‌وری,زمین شناسی,کرج,تهران}, url = {https://www.jiraeg.ir/article_68216.html}, eprint = {https://www.jiraeg.ir/article_68216_14549fafe6052cd17fdc25bfcf995fb9.pdf} }