رضائی، م.، 1395. طراحی الگوی حفاری و انفجار معدن سنگ لاشه بغده کندی سقز، طرح تحقیقاتی، دانشگاه کردستان. 75 ص.
Dehghani, H., Ataee-pour, M., 2011. Development of a model to predict peak particle velocity in a blasting operation, Int. J Rock Mech. Min. Sci. 48(1): 51–58.
John-Paul, L., Jan Van, M., Sebastien, D., 2006. Prediction of fragmentation and yield curves with reference to armourstone production, Eng Geol. 87: 60-74.
Kalayci, U., Ozer, U., Karadogan, A., Celiksirt, M.C., Erkan, V., 2010. Delpat applications and ground vibration analysis caused by blasting at excavation of Boyabad dam and H.P.P construction. 10th International Multidisciplinary Scientific GeoConference SGEM, Vol. 1: 395–406.
Kulatilake, P.H.S.W., Qiong, W., Hudaverdi, T., Kuzu, C., 2010. Mean particle size prediction in rock blast fragmentation using neural networks, Eng Geol. 114(3-4): 298–311.
Liu, J., Sun, P., Liu, F., Zhao, M., 2014. Design and optimization for bench blast based on Voronoi diagram, Int. J Rock Mech. Min. Sci. 66: 30–40.
Lownery, M.A., Kemeny, J., Girdner, K., 2001. Advances in blasting practices through the accurate quantification of blast fragmentation, Mining Engineering 53(10): 55–61.
Monjezi, M., Rezaei, M., Yazdyan Varjani, A., 2009. Prediction of rock fragmentation due to blasting in Gol-E-Gohar iron mine using fuzzy logic, Int. J Rock Mech. Min. Sci. 46(8): 1273–1280.
Monjezi, M., Rezaei, M., Yazdyan, A., 2010. Prediction of backbreak in open-pit blasting using fuzzy set theory, Expert Syst. Appl. 37(3): 2637–2643.
Qu, S.J., Hao, S.H., Chen, G.P, Li, B.H., Bian, G.Z., 2002. The BLAST-CODE model-A computer- aided bench blast design and simulation system, Int. J. Blast Frag. 6(1): 85–103.
Rezaei, M., Monjezi, M., Yazdian Varjani, A., 2011. Development of a fuzzy model to predict flyrock in surface mining, Safety Sci. 49(2): 298–305.
Yang, H.S., Rai, P., 2011. Characterization of fragment size vis-à-vis delay timing in quarry blasts, Powder Techno. 25(1): 120-126.
Yang, R., Kavetsky, A., Mckenzie, C.K., 1989. A two-dimensional kinematic model for predicting muckpiles hape in bench blasting, Int J Min Geol Eng. 7(3): 209–226.
Zhu, Z.M., 2009. Numerical prediction of crater blasting and bench blasting, Int. J Rock Mech. Min. Sci. 46(6): 1088–1096.